A wooden carpenter's toolbox with its lid open and its top tray lifted out and set beside it, the box and the tray both filled with tools in their slots: a saw, chisels, a hammer and screwdrivers
Your brain2 min read

What do filled, checked and out of date mean in my brain?

Every document in your brain has a state. bernard shows it when it reads your brain back.

The prompt

“Which documents in my brain are missing, not checked or out of date, and which should I look at first?”

Signed in, Get my prompt fills in your site for you. Otherwise press Copy and fill in the [bracketed] parts. First time? Connect your AI to bernard once: Use your own AI (opens in a new tab).

StateMeans
MissingNothing written yet
FilledWritten, but nobody has checked it - usually a draft from bernard’s survey, or a change saved as a draft
CheckedYou confirmed or corrected it, on the date shown
DeclinedYou chose not to answer; bernard stops asking
Out of dateNot checked for a while, so it may no longer be true - an offer after six months, a content plan after two

Depth

bernard also shows how deep your brain is, ring by ring: for each ring, how many documents are filled and how many are checked. The rings come from the Contour Methodology, the method behind your business brain. Each ring has a name:

  • Public Context - what anyone can find out about your business. It fills first, from bernard’s survey of your website.
  • Organisational Knowledge - how your business runs: your people, your history.
  • Proprietary Methodology - your own methods and the way you do things.
  • System Integration - the tools and data your business already runs on, connected up.
  • Flow - the point where all of that knowledge does day-to-day work for you.

The deeper rings fill from your answers over time.

The one thing that helps most

One real correction is worth more than a page of drafted text. When you correct a document, bernard marks it checked. In the Contour Methodology, your first real correction to your Public Context is its calibration gate: the check that a draft is right, not just “close enough”. See How do I correct something bernard has got wrong about my business?.

A change saved as a draft is different. It changes the words but does not mark the document checked, and it removes an earlier check, because the words are new. Changes made by someone on the bernard team always save as drafts, so only you can check a document.

We switch Bernard Brain on for your business when you email hello@bernardmoves.com.

Questions people ask

Why does checked matter if a document is already filled?
Filled means bernard or someone wrote it. Checked means you confirmed it. A drafted document that nobody corrected is only a guess, so bernard treats checked documents as the ones to rely on.
How do I mark a document checked?
Correct something in it through bernard. When you approve a change, bernard marks that document checked by you, with today’s date. A change saved as a draft does not count: it stays filled until you check it.
Can I say I would rather not answer?
Yes. Tell bernard and it records that you declined, so it stops asking. A declined document is answered, not empty.

Next